3/11/2024 0 Comments Download geo 5 full crackThe external surfaces have been designed to maximise the views from the site. The proposed development is also seen to achieve the best use of the existing podium and podium leads, as well as adding a new basement level and extended retail space.Īrchitects and developers have given the building a solid appearance, combining a new concrete frontage with aluminium louvres to protect the skeleton of the building. Image caption The new retail podium is designed to maximise the views from the site Meanwhile, a total of 3,800 sq m will be left undeveloped, along with 2,000 sq m of offices and 3,100 sq m of residential space. Of this, almost 14,000 sq m is designated for use as a “shopping centre”. Greenwich Council planning documents (PDF) allow for a total of 33,900 sq m of retail space on the site. The project’s architects, Foster + Partners and structural engineers Rethink have now expressed their disappointment, saying that they would not have been able to submit a successful scheme to the planning process. According to the digest, the Landmarks panel has held an all-day meeting to consider the proposals for the 2nd and 3rd floors of the Shard development, and it says “It was not possible to reach a conclusion.” As a result, the scheme, which did not receive sufficient support, has been rejected.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |